Removing lead from lead core line
Posted: Thu May 10, 2007 12:42 pm
Hi,
So I've got 12lb test lead core line and I'm going to attach a monofiliment backing to it using a Albright knot, based on the link to the handy animation that I found on this site. Before I begin tying this connection though, I should remove about 3-4 inches of lead from the end. Any suggestions on how to do this? I have tried sliding the dacron back but then it frays. I've tried twisted the line about 3-4in. from the end in a vain hope of sliding the lead out?
I could leave the lead in but the knot would be bigger. Thanks in advance.

So I've got 12lb test lead core line and I'm going to attach a monofiliment backing to it using a Albright knot, based on the link to the handy animation that I found on this site. Before I begin tying this connection though, I should remove about 3-4 inches of lead from the end. Any suggestions on how to do this? I have tried sliding the dacron back but then it frays. I've tried twisted the line about 3-4in. from the end in a vain hope of sliding the lead out?
I could leave the lead in but the knot would be bigger. Thanks in advance.
