We put in a few more hours workin on the hut today....
Door locks and hooks installed....
We bolted the stove to the floor and did all the piping.....and fired her up.....works perfectly...
We then worked on some benches.....sturdy as can be for 2 people...

...or one large one....

they are attached to the wall....
We then installed the Lexan windows.....clear as bell and look very slick...perfect height when sitting on the benches for tip-up viewing....
Still to do.....
Another coat of paint on the floor....Birdee did it in the dark and missed some of the Pink...
A bit of draft sealing.....a few spots need some shoring up...
Some painting on the outside...
And a few other odd things but it's pretty much done!...
RJ